top of page

Projects

Project Name: Experimental Study of Durability and Mechanical Properties of Concrete with Recycled Concrete Aggregate and Fly Ash

  • Status: Completed

  • PI: Dr.  Dr. Yasser Mansour

  • Budget:   29500 SAR

  • Funding Agency:  Prince Sultan University (PSU)

  • Duration:  12 months (1 Jan 2020, 31 Dec 2020)

Project Name: Treatment of Expansive Soil Using Injected Polyurethane (PU) Liquid Foam: Experimental Study

  • Status: Completed

  • PI: Dr.  Mohamed Ezzat Al-Atroush

  • Budget:   22500 SAR

  • Funding Agency:  Prince Sultan University (PSU)

  • Duration:  12 months (1 Jan 2020, 31 Dec 2020)

Project Name: Assessment of the Sustainable Pedestrian Mobility in Riyadh City: A Case Study

  • Status: Completed

  • PI: Dr. Basel Sultan, Co-PI: Dr.  Mohamed Ezzat Al-Atroush

  • Budget:   15000 SAR

  • Funding Agency:  Prince Sultan University (PSU)

  • Duration:  12 months (1 Jan 2020, 31 Dec 2020)

Project Name: Design of composite energy absorption devises for automotive applications: Experimental study on the effect of the working environmental conditions of GCC area.

  • Status: Completed

  • PI: Dr.  Dr. Tamer Sebaey

  • Budget:   SAR 29,900

  • Funding Agency:  Prince Sultan University (PSU)

  • Duration:  12 months (Feb. 2020, Jan. 2021)

Project Name: Finite element analysis of partially biodegradable Ti-PGA composite implants assembled with bone fractures

  • Status: In progress

  • PI: Dr.  Dr. Hassan Mehboob

  • Budget:   SAR 16000 SAR

  • Funding Agency:  Prince Sultan University (PSU)

  • Duration:  12 months (1 Jan 2020, 31 Dec 2020)

Project Name: Characterization of an Aluminum Alloy processed using Equal Channel Angular Pressing (ECAP) + rolling over wide range of strain rates and temperatures.

  • Status: In progress

  • PI: Dr.  Dr. Asiful Seikh, Co-PI: Dr. Muneer Baig

  • Budget:   SAR 600,000 SAR

  • Funding Agency:  KACST

  • Duration:  July 2019 - July 2021 (2 Years)

bottom of page