Projects
Project Name: Experimental Study of Durability and Mechanical Properties of Concrete with Recycled Concrete Aggregate and Fly Ash
-
Status: Completed
-
PI: Dr. Dr. Yasser Mansour
-
Budget: 29500 SAR
-
Funding Agency: Prince Sultan University (PSU)
-
Duration: 12 months (1 Jan 2020, 31 Dec 2020)
Project Name: Treatment of Expansive Soil Using Injected Polyurethane (PU) Liquid Foam: Experimental Study
-
Status: Completed
-
PI: Dr. Mohamed Ezzat Al-Atroush
-
Budget: 22500 SAR
-
Funding Agency: Prince Sultan University (PSU)
-
Duration: 12 months (1 Jan 2020, 31 Dec 2020)
Project Name: Assessment of the Sustainable Pedestrian Mobility in Riyadh City: A Case Study
-
Status: Completed
-
PI: Dr. Basel Sultan, Co-PI: Dr. Mohamed Ezzat Al-Atroush
-
Budget: 15000 SAR
-
Funding Agency: Prince Sultan University (PSU)
-
Duration: 12 months (1 Jan 2020, 31 Dec 2020)
Project Name: Design of composite energy absorption devises for automotive applications: Experimental study on the effect of the working environmental conditions of GCC area.
-
Status: Completed
-
PI: Dr. Dr. Tamer Sebaey
-
Budget: SAR 29,900
-
Funding Agency: Prince Sultan University (PSU)
-
Duration: 12 months (Feb. 2020, Jan. 2021)
Project Name: Finite element analysis of partially biodegradable Ti-PGA composite implants assembled with bone fractures
-
Status: In progress
-
PI: Dr. Dr. Hassan Mehboob
-
Budget: SAR 16000 SAR
-
Funding Agency: Prince Sultan University (PSU)
-
Duration: 12 months (1 Jan 2020, 31 Dec 2020)
Project Name: Characterization of an Aluminum Alloy processed using Equal Channel Angular Pressing (ECAP) + rolling over wide range of strain rates and temperatures.
-
Status: In progress
-
PI: Dr. Dr. Asiful Seikh, Co-PI: Dr. Muneer Baig
-
Budget: SAR 600,000 SAR
-
Funding Agency: KACST
-
Duration: July 2019 - July 2021 (2 Years)